Operating schedules · in 1 model

C1 cash cost and all-in sustaining cost

Site costs, by-product credit, royalties, sustaining capital.

By Surojit Chakraverti, founder of L3VLUP and an investor running a long-short healthcare and technology equities strategy.

On this subject: c1 cash cost and all-in sustaining cost.Updated 11 November 2026

Part of project finance and infrastructure models, with the models, labs and guides around it.

What it does

The two cost measures every mine is compared on. Site costs come from the tonnes: mining cost on every tonne moved, processing cost on every tonne milled, and site overhead. C1 cash cost adds the smelter’s treatment and refining charges and freight, deducts the revenue from by-products as a credit, and divides by the payable metal of the main product. All-in sustaining cost adds royalties, the sustaining capital that keeps the mine at its present rate and corporate overhead. Expansion capital is in neither. Because the denominator is metal, a falling grade raises both measures even when the cost per tonne does not move.

Where it lives

The same schedule in each model that carries it, with the rows to open. Open a model in the browser, go to the sheet, and click the lines.

Mining model: copper-gold mine NAV
  • Assumptions, rows 43–46: Mining cost, Processing cost, Site general and administrative, Corporate general and administrative
  • Costs, rows 6–10: Mining, Processing, Site general and administrative, Site operating costs…
  • Costs, rows 13–16: Add: treatment, refining and freight, Less: gold by-product credit, C1 cash cost, C1 cash cost per pound
  • Costs, rows 19–26: Add: royalty, Add: sustaining capital, Add: corporate general and administrative, All-in sustaining cost…
  • Costs, rows 29–31: Net smelter return, EBITDA, EBITDA margin

What a reviewer looks for

  • Expansion capital counted as sustaining.
  • A by-product credit taken at a price the deck does not use.
  • Costs per unit compared between mines without checking whether each is quoted net of by-products or on a co-product basis.

Learn it, then build it

Vocabulary: All-In Sustaining Cost (AISC), Strip Ratio.

Other operating schedules

Working capital scheduleCapex and depreciation (PP&E roll-forward)Airline capacity and traffic: ASK, RPK and load factorAirline unit revenue and unit cost: RASK and CASKAirline fuel cost and hedgingType curves and production declineOil and gas reserves roll-forwardRealised prices and the field netbackUnits-of-production DD&AContainer fleet: owned, chartered, newbuilds and scrappingMine plan: from ore reserve to payable metalMine closure and rehabilitation provisionLiftings and freight rate: a liner’s revenueSystem sales and royalties: a franchisor’s units and volumesRestaurant unit economics: restaurant margin and new-unit returnsBunker fuel and the bunker adjustment factorRate base roll-forwardAllowed revenue: the building blocksRegulatory lag: earned against allowed returnHeadcount pyramid: hiring, attrition and promotionMobile subscriber roll-forward: gross adds, churn, net addsFibre build: homes passed, penetration and connectionsSpectrum licences: auction payments and amortisationTower site roll-forward: build-to-suit and decommissioningTenancy roll-forward: anchor, colocation and the tenancy ratioTower unit economics: yield on cost by tenantGround lease schedule: rent, escalators and buy-outsUtilisation and realisation: hours to fee revenueProfit per partner: pay, bonus pools and partnership profitStore estate roll-forward and cohortsRetail sales: density, like-for-like and onlineFour-wall EBITDA and new-store paybackStore leases under IFRS 16Driver-based budget: volume, price, heads and cost per headRolling forecast: actuals, reforecast and the outturnPrice-volume-mix: revenue and margin varianceCost variances: rate, volume, heads and cost per headEBITDA bridge: plan to actual and forecastCapacity cohorts: MW, GPUs, utilisation and revenueBacklog roll-forward: contracts to revenue to cashCapital roll-forwardRisk budgetTrading cost baseSponsorship revenue