Strip Ratio

The tonnes of waste rock an open-pit mine has to move to reach one tonne of ore. At a strip ratio of 2.5 a mine that mills 20 million tonnes of ore a year moves 70 million tonnes of material, and because waste costs about as much to drill, blast and haul as ore, the ratio drives the mining cost per tonne of ore. It changes through the life of a pit as each pushback is stripped and then mined, which is why cash costs move even when the ore does not.