Strip Ratio
The tonnes of waste rock an open-pit mine has to move to reach one tonne of ore. At a strip ratio of 2.5 a mine that mills 20 million tonnes of ore a year moves 70 million tonnes of material, and because waste costs about as much to drill, blast and haul as ore, the ratio drives the mining cost per tonne of ore. It changes through the life of a pit as each pushback is stripped and then mined, which is why cash costs move even when the ore does not.
See it built in a working model
- Mining model: copper-gold mine NAV Mine plan, payable metal, C1 and AISC, NAV per share.
Keep reading
DCF interview questions guideRelated Valuation terms
Go further than reading
The written material is free. These are the ways to get it applied to your own work.
CV Review by a Human
Written margin-note feedback on structure, impact bullets and ATS-readability. Reviewed by Suro, not an AI score.
US$25 48h turnaround
Cover Letter Review by a Human
Line-by-line review of argument, tailoring and tone, with a rewritten opening as a worked example.
US$50 48h turnaround
L3VLUP Pro
The subscription: personalised alerts, Apply Packs, every answer marked, full history and the whole research library.
US$25 /month
Browse the full glossary: 416 finance recruiting and technical terms, in plain English.