All-In Sustaining Cost (AISC)
What it costs a mine to produce a unit of metal and keep producing it: the cash cost of mining, processing, smelter charges and freight, net of revenue from by-products, plus royalties, the sustaining capital that holds output at its present rate and corporate overhead, per ounce or per pound sold. It leaves out expansion capital, tax and financing. The narrower C1 cash cost stops before royalties and capital, so it flatters a mine that has to keep spending to stand still; the gap between the metal price and AISC is the margin a mine really earns.
See it built in a working model
- Mining model: copper-gold mine NAV Mine plan, payable metal, C1 and AISC, NAV per share.
Keep reading
DCF interview questions guideRelated Valuation terms
Go further than reading
The written material is free. These are the ways to get it applied to your own work.
CV Review by a Human
Written margin-note feedback on structure, impact bullets and ATS-readability. Reviewed by Suro, not an AI score.
US$25 48h turnaround
Cover Letter Review by a Human
Line-by-line review of argument, tailoring and tone, with a rewritten opening as a worked example.
US$50 48h turnaround
L3VLUP Pro
The subscription: personalised alerts, Apply Packs, every answer marked, full history and the whole research library.
US$25 /month
Browse the full glossary: 416 finance recruiting and technical terms, in plain English.