Financial institutions schedules · in 1 model

Warehouse and securitisation funding at an advance rate

Notes, borrowing base, equity the lender funds itself.

By Surojit Chakraverti, founder of L3VLUP and an investor running a long-short healthcare and technology equities strategy.

On this subject: warehouse and securitisation funding at an advance rate.Updated 11 November 2026

What it does

A non-bank lender has no deposits, so it borrows against its loans. Seasoned receivables sit in term securitisations, where notes sold to investors fund a share of the pool; newer ones are pledged to a bank warehouse, which lends up to a borrowing base. Each lends at an advance rate, and the receivables neither will fund are the equity the lender must find itself. With the notes fixed by the pool, the warehouse drawn is the balancing item, and the borrowing base less what is drawn is the lender’s liquidity. Interest on both, over average debt, is the cost of funds. A cut in an advance rate costs nothing in interest and can still stop the lending, because it is a call on equity.

Where it lives

The same schedule in each model that carries it, with the rows to open. Open a model in the browser, go to the sheet, and click the lines.

Consumer lending model: loan vintages
  • Assumptions, rows 47–54: Share of receivables in term securitisations, Advance rate, securitisations, Advance rate, warehouse, Benchmark rate…
  • Funding, rows 6–13: Advance rate, securitisations, Advance rate, warehouse, Receivables in term securitisations, Securitisation notes outstanding…
  • Funding, rows 16–24: Funding need before the year’s retained earnings, Less earnings retained in the year, Less equity raised in the year, Funding need…
  • Funding, rows 27–33: Rate on securitisation notes, Rate on the warehouse, Interest on securitisation notes, Interest on the warehouse…

What a reviewer looks for

  • Debt as a flat share of assets, so no advance rate can bind.
  • Interest on the balancing facility charged on its closing balance, which is circular.
  • A funding stress modelled as a wider spread alone, missing the equity a lower advance rate demands.

Learn it, then build it

Vocabulary: Advance Rate, Securitisation, Borrowing Base, Credit Spread.

Other financial institutions schedules