Advance Rate
The share of a pool of loans or receivables that a lender or a securitisation will fund: at an advance rate of 85%, $100 of receivables supports $85 of borrowing and the owner must fund the other $15 with its own equity. The gap protects the lender against losses on the pool. When a funder cuts the advance rate the borrower has to find the difference in cash at once, which is why a funding squeeze is a call on equity before it is a cost.
See it built in a working model
- Consumer lending model: loan vintages Vintages, loss curves, allowance, advance rates, ROE, P/TBV.
Keep reading
Credit and restructuring modelsRelated Credit terms
Go further than reading
The written material is free. These are the ways to get it applied to your own work.
CV Review by a Human
Written margin-note feedback on structure, impact bullets and ATS-readability. Reviewed by Suro, not an AI score.
US$25 48h turnaround
Cover Letter Review by a Human
Line-by-line review of argument, tailoring and tone, with a rewritten opening as a worked example.
US$50 48h turnaround
L3VLUP Pro
The subscription: personalised alerts, Apply Packs, every answer marked, full history and the whole research library.
US$25 /month
Browse the full glossary: 416 finance recruiting and technical terms, in plain English.